← All projects
Moab, Utah · Affordable housing

The Collaborative 1581

Homes for everyday life.
Architecture rooted in place.

22 Communities22 Design + Lab
Architectural rendering of The Collaborative 1581 in Moab, showing warm off-white stucco, arched openings, wood-look balcony rails and desert landscaping.
The Collaborative 1581 · Exterior renderingDesign visualization. Details subject to change.
Homes
144
Buildings
3
Home types
1 to 3 bedrooms
Expected completion
May 2027
The community

A place to
call home.

The Collaborative 1581 is a 144-home affordable multifamily development at 1581 S Mill Creek Drive in Moab, Utah. Three apartment buildings bring together one-, two- and three-bedroom homes.

The design pairs arched openings and warm exterior materials with concrete ground-floor porches and shared outdoor spaces. The intent is straightforward: housing shaped with care for the people who will live here.

Development22 Communities
Design22 Design + Lab
Design + landscape

Room for life
outside.

The landscape plans include walking paths, outdoor exercise areas, a playground, pet areas and a pickleball court. Planting is organized around the buildings, paths and shared spaces.

Landscape and amenity descriptions reflect the supplied plans, not completed construction.

Exterior material direction
Stucco
SW 7011 Natural ChoiceFlat finish
Accent cladding
Longboard Rock ElmWood-look finish
Typical windows + doors
Almond
Entry canopy + arched entry doors
Black metal
From drawing to construction

The work in progress.

A selection of real construction photographs, from the site overview to the details taking shape.

Aerial construction photograph showing a long apartment building, scaffolding and its light-colored roof.
Aerial progress photograph

The building taking shape

Aerial view of the long façade and surrounding site.

Aerial construction photograph looking over the roof toward the entry end of the apartment building.
Aerial progress photograph

An overview from above

Roof and entry-end construction from above.

Construction photograph of Building 3 with scaffolding along the exterior walls.

Building 3 · Exterior work

Scaffolding and exterior wall work at Building 3.

Construction photograph showing an arched entry and framing on the adjoining part of the site.

Entry and framing

Arched entry openings, exterior work and adjacent framing.

Wide construction photograph of the long apartment façade and graded ground in front of it.

The long façade

A ground-level view of the building and exterior scaffolding.

Construction photograph looking up at the installed black metal entry canopy above an unfinished arched doorway.

The entry canopy

Black metal canopy at the arched entrance.

Photographs are presented separately from the architectural rendering. Dates are shown where provided with the source photographs; the aerial images were supplied without capture dates.

Community partners

Built together.

We recognize the organizations working alongside TwentyTwo to help make The Collaborative 1581 possible.

News + project updates

Around the project.

Reporting, partner announcements and public project records are identified separately below.

Interested in living at The Collaborative 1581? Join the future resident interest list and select this community.

Join future resident wait list
The conversation continues

Built for People.

For project and partnership inquiries, contact 22 Communities.

Contact Jake Williams

Explore more TwentyTwo work →